A Rail Capacity Framework: Making The Case For Rail Freight Evaluation in Indonesia
Clare Woroniuk, Paulus AditjandraFull PDF Download Citation Format
References
Amos, P., 2009. Freight transport for development toolkit: rail freight, Washington D.C.: World Bank Department for International Development.
Assad, A.A., 1980. Models for rail transportation. Transportation Research Part A: General, 14, pp.205–220.
Banister, D., 2005. Unsustainable Transport City Transport in the new century, Abingdon: Routledge Taylor & Francis Group.
Burdett, R.L. & Kozan, E., 2006. Techniques for absolute capacity determination in railways. Transportation Research Part B: Methodological, 40, pp.616–632.
Centre for Logistics and Supply Chain Studies ITB et al., 2013. State of Logistics Indonesia 2013, Jakarta.
Coordinating Ministry for Economic Affairs Republic of Indonesia, 2011. Masterplan for Acceleration and Expansion of Indonesia Economic Development 2011-2025 2nd ed., Jakarta: Coordinating Ministry for Economic Affairs, Republic of Indonesia.
Crainic, T.G. & Laporte, G., 1997. Planning models for freight transportation. European Journal of Operational Research, 97, pp.409–438.
Dessouky, M.M. & Leachman, R.C., 1995. A simulation modelling methodology for analyzing large complex rail networks. Simulation, 65(2), pp.131–142.
Dikun, S., 2010. Future Indonesian Railways An Interface Report Towards The National Railway Master Plan, Jakarta. Indonesia Infrastructure Initiative (IndII), Australia Indonesian Partnership.
Djuraid, H.M., 2013. JONAN & Evolusi Kereta Api Indonesia 3rd ed., Jakarta: Sarana Kata Grafika.
Huisman, T., Boucherie, R.J. & Van Dijk, N.M., 2002. A solvable queueing network model for railway networks and its validation and applications for the Netherlands. European Journal of Operational Research, 142, pp.30–51.
Kawaguchi, H., Wachi, T. & Sadayuki, Y., 2010. Freight flow analysis and estimation of pavement cost reduction by overloaded truck utilizing weighbridge survey in the Central Java region. In 12th World Conference on Transport Research Lisbon Portugal. pp. 1–18.
Kraft, E.R., 1982. Jam capacity of single track rail lines. In Proceedings of the 23rd Annual Meeting Transportation Research Forum. New Orleans: Transportation Research Forum, pp. 461–471.
Krueger, H., 1999. Parametric modeling in rail capacity planning. WSC’99. 1999 Winter Simulation Conference Proceedings. “Simulation - A Bridge to the Future” (Cat. No.99CH37038), 2, pp.1194–1200.
Lai, Y.-C. (Rex), Shih, M.-C. & Jong, J.-C., 2010. Railway Capacity Model and Decision Support Process for Strategic Capacity Planning.
Transportation Research Record: Journal of the Transportation Research Board, 2197(2), pp.19–28.
Lai, Y.-C. & Wang, S.-H., 2012. Development of Analytical Capacity Models for Conventional Railways with Advanced Signaling Systems. Journal of Transportation Engineering, 138(JULY), pp.961–974.
Lubis, H.A.S. & Nurullah, P., 2007. Recent development of Indonesian railway institution. Journal of the Eastern Asia Society for Transportation Studies, 7(13), pp.1886–1901.
Lubis, H.A.S. & Sjafruddin, A., 2005. Multimodal transport in Indonesia: recent profile and strategy development. Journal of the Eastern Asia Society for Transportation Studies, 5, pp.46–64.
Marinov, M. & Viegas, J., 2011. A mesoscopic simulation modelling methodology for analyzing and evaluating freight train operations in a rail network. Simulation Modelling Practice and Theory, 19, pp.516–539.
Meyrick, S., 2012a. Multimodal transport strategy: Java corridor final report of scoping study - Consultant Report, Porthcawl Pty Ltd. Australian AID Indonesia Infrastructure Initiative (IndII).
Meyrick, S., 2012b. OECD Reviews of Regulatory Reform INDONESIA Regulatory and Competition Issues in Port, Rail and Shipping, Porthcawl Pty Ltd. OECD.
Muthohar, I. & Sumi, T., 2010. Sustaining Political and Financial Allocation as a Sustainable Approach in Transport Policy Development : The Case of Indonesia’s Railway during the Restructuring Process. Journal of Sustainable Development, 3(3), pp.76–84.
Muthohar, I., Sumi, T. & Sutomo, H., 2010. The Implementation and Impacts of PSO , IMO , and TAC Schemes on National Railways Reform in Indonesia. Journal of the Eastern Asia Society for Transportation Studies, 8.
Newman, P. & Kenworthy, J.R., 1999. Sustainability and cities: overcoming automobile dependence, Washington D.C.: Island Press.
Petersen, E.R., 1974. Over-the-Road Transit Time for a Single Track Railway. Transportation Science, 8, pp.65–74.
Railway Gazette, 2012. PPP model to fund Kalimantan coal network. Available at: http://www.railwaygazette.com/news/single-view/view/ppp-model-to-fund-kalimantan-coal-network.html.
Railway Gazette, 2013. Rail network proposed in Sulawesi. Available at: http://www.railwaygazette.com/news/infrastructure/single-view/view/rail-network-proposed-in-sulawesi.html.
Sjafruddin, A. et al., 2010. Policy Evaluation of Multimodal Transportation Network : The Case of Inter-island Freight Transportation in Indonesia. Asian Transport Studies, 1(1), pp.18–32.
Susantono, B., 2009. 1001 Wajah Transportasi Kita A. Endah, ed., Jakarta: PT Gramedia Pustaka Utama.
Susantono, B., 2012. Manajemen Infrastruktur dan Pengembangan Wilayah (Managing Infrastructure and Regional Development), UI-Press.
Susantono, B., 2013. Transportasi & Investasi, Jakarta: Penerbuit Buku KOMPAS.
Van der Ven, J., 2009. The market for railways in Indonesia, Jakarta. Indonesia Infrastructure Initiative.
Wachi, T. et al., 2011. Development of Railway Regulatory Scheme in Central Java Region of Indonesia. Transportation Research Record: Journal of the Transportation Research Board, 2239, pp.93–100.
Yalçinkaya, Ö. & Mirac Bayhan, G., 2012. A feasible timetable generator simulation modelling framework for train scheduling problem. Simulation Modelling Practice and Theory, 20, pp.124–141.
Copyright © 2019 Clare Woroniuk, Paulus Aditjandra

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.