Risk Analysis on Conceptual Design of Soekarno – Hatta International Airport Rail Link Project Using Value Engineering
Herawati Z. Rahman, Mohammed A Berawi, Suci I. Susilowati, Perdana Miraj, Jade S. PetroceanyFull PDF Download Citation Format
References
Berawi, M. A., Susantono, B., Miraj, P., Berawi, A. R. B., Rahman, H. Z., & Husin, A. (2014). Enhancing Value for Money of Mega Infrastructure Projects Development Using Value Engineering Method. Procedia Technology, 16, 1037-1046.
Berawi, M. A., & Susantono, B. (2012). Developing Conceptual Design of Mega Infrastructure Project: Creating Innovation and Added Value. Value World,35(1), 12-20.
Tang, S., & Lo, H. K. (2008). The impact of public transport policy on the viability and sustainability of mass railway transit - The Hong Kong experience. Transportation Research Part A: Policy and Practice, 42(4), 563-576.
Grimsey, D., & Lewis, M. K. (2005). Are Public Private Partnerships value for money?: Evaluating alternative approaches and comparing academic and practitioner views. In Accounting Forum (Vol. 29, No. 4, pp. 345-378). Elsevier.
Dell’Isola, A. (1997), Value Engineering : Practical Application for Design Construction Maintenance & Operations, R.S. Means Company, Inc., Kingstone, USA.
Haghnegahdar, L., & Asgharizadeh, E. (2008,). The Risk and Value Engineering Structures and their Integration with Industrial Projects Management (A Case Study on IK Corporation). In Proceeding of World Academy of Science, Engineering and Technology (Vol. 30).
Janic, M., & Reggiani, A. (2002). An application of the multiple criteria decision making (MCDM) analysis to the selection of a new hub airport. European journal of transport and infrastructure research EJTIR, 2 (2).
Jin, X. H., & Zhang, G. (2011). Modelling optimal risk allocation in PPP projects using artificial neural networks. International journal of project management, 29(5), 591-603.
Ke, Y., Wang, S., Chan, A. P., & Lam, P. T. (2010). Preferred risk allocation in China’s public–private partnership (PPP) projects. International Journal of Project Management, 28(5), 482-492.
Yoo, K. E., & Choi, Y. C. (2006). Analytic hierarchy process approach for identifying relative importance of factors to improve passenger security checks at airports. Journal of Air Transport Management, 12(3), 135-142.
Zietsman, D., & Vanderschuren, M. (2014). Analytic Hierarchy Process assessment for potential multi-airport systems - The case of Cape Town. Journal of Air Transport Management, 36, 41-49.
Zou, Patrick XW, Shouqing Wang, and Dongping Fang. "A life-cycle risk management framework for PPP infrastructure projects." Journal of financial management of property and construction 13.2 (2008): 123-142.
Copyright © 2019 Herawati Z. Rahman, Mohammed A Berawi, Suci I. Susilowati, Perdana Miraj, Jade S. Petroceany

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.